Friday, June 30, 2006

Floors, faucets, and sinks

Here is the crew installing the floor in our bedroom. They finished the 3 bedrooms and our closet. They were supposed to be back today to do the hallways. But we didn't see them. Neither did we see the cultured marble guys doing our shower. They lack two pieces of trim and were supposed to run by our house and finish up before they went to the other job today. And the shower fixture will be installed when they are finished.....

The front bedroom floor finished. Except for the quarter round that is going around the edges. That bright glare is because I spent the day cleaning the windows. They sure do look good. The ones I cleaned, that is. We plan to go back on Monday to finish the other ones. I'm only doing the inside. The cleaning crew can do the outside. They will have to be cleaned again anyway after all the construction is finished.

Dishwasher, kitchen sink, faucets, and newly installed tile backsplash (not yet grouted).

And the bathroom sinks and faucets. The lights are down until the sheetrock is repaired and repainted.

No comments: